Snapshot of Mooney's Bay Station - October 16, 2023

IMG_2759
Continue reading
Tags:

Snapshot of Mooney's Bay Station - August 6, 2023

DSC04175
Continue reading
Tags:

Snapshot of Mooney's Bay Station - May 28, 2023

IMG_3533
Continue reading
Tags:

Snapshot of Mooney's Bay Station - May 18, 2023

dji_fly_20230518_141906_627_1684434025231_photo_optimized
Continue reading
Tags:

Snapshot of Mooney's Bay Station - April 16, 2023

PXL_20230416_182309826
Continue reading
Tags:

Snapshot of Mooney's Bay Station - February 2, 2023

IMG_7930
Continue reading
Tags:

Snapshot of Mooney's Bay Station - December 29, 2022

PXL_20221229_201157337
Continue reading
Tags:

Snapshot of Mooney's Bay Station - October 24, 2022

Ff1-qxhXEAImM14
Continue reading
Tags:

Mooney's Bay

IMG_0851

Mooney's Bay Station (originally named Confederation Station) is one of the 5 original O-Train stations in Ottawa. Opened on October 15, 2001 with the initial network, this station is located in the Confederation Heights area of Ottawa.

This station primarily serves government offices, Canada Post's headquarters, Brookfield High School, among other destinations a short walking distance away, such as Hog's Back Park and Vincent Massey Park.

Mooney's Bay Station is accessible just below street level by paved ramps off of Heron Road by the Airport Parkway.

The station's layout is among the simplest on the O-Train network. From street level, a simple path with stairs and ramp provide access to the ticket and fare kiosk, which exit to a short path connecting to the platform. 

This station was modified in 2017 to accomodate the fare gates and kiosk installations. A new pathway to access the station was created, that bypassed the existing recreational pathway that runs adjacent to the station.

As there is only one platform to board trains in either direction, attention must be paid to the train's destination sign or the direction of travel of the arriving train, Bayview for trains heading left and Greenboro for trains heading right.

There isn't any art on display at this station however due to its position and location, it is mostly surrounded by lots of green grass and bush, making for a calm and relaxing place to wait for the next train's arrival.

UNIQUE FEATURES

The sloping and sweeping ramp to reach the station entrance is quite unique. The station itself also has a calm feel to it with all the green grass and slopes surrounding it.

PUBLIC ARTWORK

Mooney's Bay Station does not currently feature any public artwork.

STATION FACTS AND MAP
  • Opening Date: October 15, 2001
  • Line: Trillium Line
  • Previous Station: Carleton (1375 metres)
  • Following Station: Greenboro (2815 metres)

 STATION RIDERSHIP (November 2019)

  • Balanced Boardings: 30,000
  • Weekday Average: 1,200
  • Weekend Average: 600

Balanced boardings are the average number of entries and exits at O-Train stations. O-Train Line 2 ridership is based on Automatic Passenger Counters aboard O-Train Line 2 trains.


Line 2 (Trillium Line) is currently closed and in the process of being expanded for the Line 2 South Extension, which will see longer trains and double platforms. Below are some concept renders of the expanded station (Line 2), scheduled to open in 2022.

Mooney's Bay Station is an existing station located south of Heron Road, which will be served by one fare paid entrance located west of the alignment and accessible from the adjacent MUP. The existing fare control enclosure will remain. The station will be designed for any modifications needed at the entrance enclosure. Platform extensions will be designed and constructed with all related shelters and requirements.

Continue reading

Snapshot of Mooney's Bay Station - October 11, 2022

dji_export_1665426206512
Continue reading
Tags:

Snapshot of Mooney's Bay Station - August 15, 2022

mooney2

Mooney's Bay Station single platform near completion, getting ready to grade and re-install the track / rails. 

Continue reading
Tags:

Snapshot of Mooney's Bay Station - July 11, 2022

FXZyB-dWIAMhXCd
Continue reading
Tags:

Snapshot of Mooney's Bay Station - June 5, 2022

dji_export_1654442530766
Continue reading
Tags:

Snapshot of Mooney's Bay Station - April 3, 2022

IMG_20220403_122848986_HDR
Continue reading
Tags:

Snapshot of Mooney's Bay Station - November 13, 2021

FEQPpG6XMAImb3X

Very solid and deep concrete works for the extended single track/platform Mooney's Bay Station. Note the insulated toilet faculties by the crane. Trillium Line Stage 2.

Continue reading
Tags:

Snapshot of Mooney's Bay Station - October 4, 2021

FA4LFhYWEA8rx1j

So much conduit and concrete for the redeveloped and lengthened Trillium Line Stage 2 stations.

Continue reading
Tags:

Snapshot of Mooney's Bay Station - September 1, 2021

PXL_20210901_162243059
Continue reading
Tags:

Snapshot of Mooney's Bay Station - July 28, 2021

E7atJFRXMAQtK-f

Went by the Brookfield crossing to check out the progress of the new flyover. Still some work to do on the south side of the flyover. Where as there's been some progress on the new expanded Mooney's Bay Stn platform.

Continue reading
Tags:

Snapshot of Mooney's Bay Station - June 14, 2021

E33clN5XIAUMJwZ

Mooney's Bay Station is probably the simplest in the Trillium Line Stage 2 enhancements, with no elevators/stairs required, but still much permanent platform rebuild and lengthening. VIA crossing/new flyover in background.

Continue reading
Tags:

Snapshot of Mooney's Bay Station - April 14, 2021

607895061693b-20210414_162046

Mooney's Bay Station will not see dramatic changes like other nearby stations, however the platform is being completely rebuilt to the longer length to accommodate the Stadler FLIRT and coupled Alstom Coradia LINT trains. Foundation appears complete and work seems to be advancing well now with the warmer weather.

Continue reading
Tags:

Snapshot of Mooney's Bay Station - November 28, 2020

Mooney's Bay Station looking southbound, as it undergoes LRT Phase 2 renewal. Work continues to rebuild the platforms, which will be doubled in length to accommodate the new train sets and the existing trains that will now be coupled.

Continue reading
Tags:

Snapshot of Mooney's Bay Station - October 27, 2020

mooney2
Continue reading
Tags:

Snapshot of Mooney's Bay Station - October 26, 2020

mooney1

Tracks removed for Stage 2 platform extensions at single track Mooney's Bay Station. Recently built fare gate building intact.

Continue reading
Tags:

Snapshot of Mooney's Bay Station - September 28, 2020

mooneysbay

 Tracks ripped up for platform extension at Mooney's Bay Station. The Stadler FLIRT trains are twice as long!

Continue reading
Tags:

Snapshot of Mooney's Bay Station - June 18, 2020

mb4
Looking at the Mooney's Bay Platform and destination signage.
Looking at the entrance far gate kiosk for Mooney's Bay Station, with the platform access ramp in the foreground.
Fare gates, and ticket vending machines removed and mounting locations in the floor covered up.
Continue reading
Tags: