Scenes from the Beech St Bridge, working to widen the trench from Bayview Station/Gladstone and under Queensway, to double the tracks to this point. Single track from here south, through Dow's Lake (Carling) Station to the Carleton Station switch.
Tenting over the "White" Bridge over the Rideau River near Carleton University in prep for pier rehabilitation. New MUP bridge will be just to the right/upstream.
While taking the photo from the Young Street extension over the Trillium Line, a supervisor was nearby and explained what was taking place. They have one machine driving into the rock from above, then they have the other driller machine that's in the trench dig away from the side. This is part of the work to widen the trench between Corso Italia and Dow's Lake Stations.
The Lincoln Fields rail flyover, permitting Lines 1 and 3 to diverge to their respective destinations. This photos were taken from a bus riding along the Transitway underneath the structure, in the same way that future O-Train Line 1 will travel.
As part of the Stage 2 O-Train Trillium Line South Extension project, work is proceeding on the Ellwood Diamond rail bridge, which will allow VIA Rail trains to safely pass below the Trillium Line.
A drive down regional road 174 between Blair and Trim Roads shows plenty of progress and change occurring in the highway median to accommodate the future O-Train Stations.
In this video, you will see the rail flyover, Montreal, Jeanne d'Arc, Convent Glen, Place d'Orleans and Trim Stations.
The video first plays in the eastbound direction. The return trip to Blair going westbound begins at 02:30 in the video.
View the recent Eastern Snapshot Updates below
Snapshot of Trim Station - February 21, 2021
Snapshot of Place d'Orleans Station - February 21, 2021
Snapshot of Convent Glen Station - February 21, 2021
Snapshot of Jeanne d'Arc Station - February 21, 2021
Snapshot of Montreal Station - February 21, 2021
This flyover will enable service further West from Lincoln Fields towards Moodie and Algonquin Stations. Trains bound for Moodie will make use of the flyover, while trains to Algonquin will pass underneath.
Progress on the Lester Rd bridge and embankment for Trillium Line Stage 2. Note bridge span wide enough for 4 lane Lester, but narrow for only single rail track.
At Brookfield East and VIA Diamond, it appears #TrilliumLine Stage 2 flyover will shift a few feet NE of the current Sawmill Creek and Transitway bridge.
Working on Stage 2 VIA Rail flyover bridge. Note abandoned tracks still there in North East quadrant if you ever need to reconnect for a freight movement.
For Trillium Line / VIA Rail flyover near Brookfield / Airport Parkway Bridge, equipment being dropped into pier caisson, and ties and tie plates stored for reuse.