Snapshot of Dow's Lake Station - February 26, 2024

IMG_4424_result
Continue reading
Tags:

Snapshot of Dow's Lake Station - January 23, 2024

PXL_20240123_230528501.MP
Continue reading
Tags:

Snapshot of Dow's Lake Station - December 4, 2023

IMG_3285
Continue reading
Tags:

Snapshot of Dow's Lake Station - October 14, 2023

IMG_2703
Continue reading
Tags:

Snapshot of Dow's Lake Station - August 6, 2023

DSC03936
Continue reading
Tags:

Snapshot of Dow's Lake Station - July 22, 2023

dji_fly_20230722_162410_752_1690057493776_photo_optimized
Continue reading
Tags:

Snapshot of Dow's Lake Station - July 8, 2023

image0
Continue reading
Tags:

Snapshot of Dow's Lake Station - June 10, 2023

PXL_20230610_185830875
Continue reading
Tags:

Snapshot of Dow's Lake Station - May 30, 2023

PXL_20230530_211432202
Continue reading
Tags:

Snapshot of Dow's Lake Station - May 18, 2023

dji_fly_20230518_174016_647_1684446022875_photo_optimized
Continue reading
Tags:

Snapshot of Dow's Lake Station - October 22, 2022

IMG_6937
Continue reading
Tags:

Dow's Lake

IMG_0827

Dow's Lake Station is one of the 5 original O-Train stations in Ottawa. Opened on October 15, 2001 with the initial network, this station is located off of Carling Avenue, just across from Dow's Lake. This station was originally named Carling, but was renamed in 2020 to Dow's Lake as part of the Stage 2 expansion to better align with nearby destinations.

This station primarily serves the businesses along Carling Avenue, the Rideau Canal and Dow's Lake, as well as providing a connection to the nearby Ottawa Hospital - Civic Campus.

Dow's Lake Station is accessible below street level by stairs and elevator access from Carling Avenue near the intersection of Preston Avenue in Little Italy.

The station's layout is relatively simple. From street level, a path guides you to the fare gate kiosk, and from there you have the option of taking the stairs or the elevator to platform level. The stairs have an embedded heating system, to aid in the removal of snow and ice during the winter.

This station was modified in 2017 to accommodate the installation of fare gates and the kiosk building. As a result, the stairs were slightly reconfigured as they previously were accessible directly from the pathway.

As there is only one platform to board trains in either direction, attention must be paid to the train's destination sign or the direction of travel of the arriving train, Greenboro for trains heading left and Bayview for trains heading right.

This station does not contain any public art on display. Its location below grade and away from the street provides a quiet area to wait, in a trenched area of cut rock.

UNIQUE FEATURES

This is the only Line 2 Station that is below grade, requiring access via stairs or elevator to reach the platform level from the entrance.

PUBLIC ARTWORK

Dow's Lake Station does not currently feature any public artwork.

STATION FACTS AND MAP
  • Opening Date: October 15, 2001 (Originally named Carling)
  • Line: Trillium Line
  • Previous Station: Bayview (1575 metres)
  • Following Station: Carleton (1720 metres)

STATION RIDERSHIP (November 2019)

  • Balanced Boardings: 51,000
  • Weekday Average: 2,000
  • Weekend Average: 800

Balanced boardings are the average number of entries and exits at O-Train stations. O-Train Line 2 ridership is based on Automatic Passenger Counters aboard O-Train Line 2 trains. 


Line 2 (Trillium Line) is currently closed and in the process of being expanded for the Line 2 South Extension, which will see longer trains and double platforms. Below are some concept renders of the expanded station (Line 2), scheduled to open in 2022.

Dow's Lake Station is an existing station located north of Carling Avenue served by an entrance from the adjacent MUP to the east of the alignment. A new elevator will be constructed to provide redundancy in serving the station entrance and platform. In addition to the new elevator, the existing elevator will be refurbished.

Design and construction of the station will not preclude a future double-tracking, as well as a potential connection to the future hospital site, south of Carling Avenue.

Continue reading

Snapshot of Dow's Lake Station - October 11, 2022

dji_export_1665426205897
Continue reading
Tags:

Snapshot of Dow's Lake Station - September 18, 2022

dow
Continue reading
Tags:

Snapshot of Dow's Lake Station - July 18, 2022

FX9CkWRXkAE1CbE
Continue reading
Tags:

Snapshot of Dow's Lake Station - June 12, 2022

dji_export_1655068995941
Continue reading
Tags:

Snapshot of Dow's Lake Station - May 11, 2022

dji_export_1652273879938
Additional photos below by Derek Ellis
Continue reading
Tags:

Snapshot of Dow's Lake Station - April 20, 2022

dji_export_1650493553128
Continue reading
Tags:

Snapshot of Dow's Lake Station - March 18, 2022

IMG_3285
Continue reading
Tags:

Snapshot of Dow's Lake Station - January 25, 2022

20220127-15080520220125_211846
Continue reading
Tags:

Snapshot of Dow's Lake Station - December 13, 2021

20211215-190507FGf-LdRXIAUqFPJ

Massive tent structures being erected over the Station to allow Stage 2 construction to continue over winter.

Continue reading
Tags:

Snapshot of Dow's Lake Station - November 1, 2021

FDIxQtAXEAAY3-a

Progress on the single track Dow's Lake Station and added elevator. The station will serve the "nearby" new Civic Hospital. Note all the coloured conduit in the second image. This will be a major fiber optic cable trunk. 

Continue reading
Tags:

Snapshot of Dow's Lake Station - October 22, 2021

Continue reading
Tags:

Snapshot of Dow's Lake Station - August 15, 2021

PXL_20210815_174336252
Continue reading
Tags:

Snapshot of Dow's Lake Station - August 3, 2021

image1
Continue reading
Tags: