Airport (2024)

Airport Station (Feb 2024)

Airport Station is a new station at the Macdonald-Cartier International Airport and will represent the terminus of the Airport Link. It will be a new elevated station located adjacent to the airport departure roadway and the airport passenger terminal building. The entrance and lounge will be an extension of the airport terminal building and the station platform will be at the same elevation as the third level of the airport passenger terminal building.
The design of the station will be closely coordinated with the Airport Authority throughout design development as they will extend the existing airport passenger terminal structure to the station. The station, platform, guideway and guideway structures will be constructed to allow the Airport Authority to construct the airport passenger terminal expansion, including the entrance and lounge directly, together.

Continue reading
Tags:

Snapshot of Airport Station - January 4, 2024

PXL_20240106_183341017.MP
Continue reading
Tags:

Snapshot of Airport Station - July 25, 2023

IMG_3394
Continue reading
Tags:

Snapshot of Airport Station - June 5, 2023

PXL_20230605_211400518.MP
Continue reading
Tags:

Snapshot of Airport Station - May 17, 2023

1684334876440
Continue reading
Tags:

Snapshot of Airport Station - February 18, 2023

Airport Station - February 18 2023 Airport Station from the North

Work continues at Airport Station, with customer facing elements and finishes being installed. Wayfinding, ticket vending machines and most of the platform access is complete.

Continue reading
Tags:

Snapshot of Airport Station - September 11, 2022

Continue reading
Tags:

Snapshot of Airport Station - April 14, 2022

IMG_8229
Continue reading
Tags:

Snapshot of Airport Station - April 5, 2022

IMG_3379
Continue reading
Tags:

Snapshot of Airport Station - March 17, 2022

Now that the tarps are down, a lot of progress can be seen at Airport Station as trims and finishes are starting to appear.

Continue reading
Tags:

Snapshot of Airport Station - February 26, 2022

20220304-154740IMG_3178
Continue reading
Tags:

Snapshot of Airport Station - November 24, 2021

20211206-161123IMG_2582
Continue reading
Tags:

Snapshot of Airport Station - October 30, 2021

FC9s8MHXIAoXsC_

Airport Spur, the guideway and partially protected connection between the Terminal and platform/shelter. Only single Alstom Coradia LINT trainsets fit here and a pair will shuttle to South Keys transfer, meeting at EY Centre (Uplands) Station.

Continue reading
Tags:

Snapshot of Airport Station - November 4, 2021

IMG_2466
Continue reading
Tags:

Snapshot of Airport Station - September 23, 2021

image0

The overhead pedestrian walkway frame linking the airport terminal and the airport O-Train station is now in place.

Continue reading
Tags:

Snapshot of Airport Station - September 7, 2021

image1
Continue reading
Tags:

Snapshot of Airport Station - August 29, 2021

image1
Continue reading
Tags:

Snapshot of Airport Station - August 9, 2021

IMG_1733
Continue reading
Tags:

Snapshot of Airport Station - July 12, 2021

IMG_1294

The Airport Station guideway, station itself and connection to the airport terminal continue to advance at a good pace.

Continue reading
Tags:

Snapshot of Airport Station - February 26, 2021

image1

The Airport Stations elevated guideway and station platform are in place. Already, the station structure itself is being assembled and constructed.

Continue reading
Tags:

Snapshot of Airport Station - January 6, 2021

airport1

Airport Station and the alignment is progressing! All elevated segments are in place! Last beam was installed yesterday (one connecting to the landing) in the evening. Still a lot of work but at least the structure is there. 

Continue reading
Tags: