Snapshot Updates

Snapshot of Stadler FLIRT C12 - January 27, 2022

This afternoon they trucked the Stadler FLIRT modules up from Greeley storage and assembled them into trainset C12. Here they are lifting the center power module from the heavy load truck, between the other modules.

2 outside modules at east end. And Trackmobile to maneuver into position. Six on order, C10 and C11 assembled. C1 to C3 scrapped Talents (20 yrs old), C4 to C9 Coradia LINT, 2 will serve airport spur, others double coupled for mainline.

South Keys Station - January 31, 2022
Walkley Station - January 26, 2022