The Stations

Kìchì Sìbì (2026)

Kìchì Sìbì Station is an existing Transitway Station, which will be located within the existing Transitway trench between Dominion Avenue and Berkley Avenue. Bicycle parking will be provided in the station's public entrance plaza, which is designed to provide public access across the guideway linking pedestrians and cyclists from Dominion Avenue to Workman Avenue with direct connection to the NCC pathway on the Sir John A. Macdonald Parkway.

The pedestrian bridge east of the station near Roosevelt Avenue will be decommissioned throughout construction. PPUDO spaces will be conveniently located near the station plaza on Dominion Avenue.

Related to this article